Cable Routing
The next installation step is the cable routing. The cables from the runways must be routed into and through the cross members, around the pulleys and up into the columns to be attached at the adjustment point at the top of each column. This was the only step of the installation that required some disassembly of the factory hardware that had already been installed in order to feed the cables through properly. Here are some images of that process:
HAD TO REMOVE PICS TOO MANY FOR A SINGLE POST LIMITED TO 7
It may not show up well in the photos but each cable is routed through a tensioner that locks against the cable and keeps it in a locked position. This is the secondary cable lock system and not found on low end products. This is a requirement for ALI certification to the ANSI standards. If there is a failure of the primary load suspension mechanism (the cable), the locks will automatically engage. Here is a picture of that mechanism:
|
|